As part of the Phase 1 Sewer Expansion Project, TWWD has secured loans and grant funding to tie in approximately 49 homes that have already have access to existing sewer infrastructure and, per Town ordinance and TWWD Rules and Regulations are required to tie in to the system.

If your property is adjacent to existing sewer infrastructure as of January 1, 2016 you will be part of this project.

USDA PHASE 1 SEWER EXPANSION PROJECT: ABUTTERS (Properties that have access to existing sewer infrastructure)

Project Summary

Number of Properties: 49 (click here for list of properties)

Project Description:  The project will utilize USDA grant and loan funds to connect properties that abut existing sewer infrastructure and should be tied in per Tiverton Town Ordinance and TWWD Rules and Regulations. The project will include design engineering services and construction to bring service from the exterior building sewer connection to the sewer main in the roadway and the decommissioning of the existing onsite system (Septic or Cesspool).

Cost:  The project will have a not-to-exceed assessment of $6,000.

Financing:  TWWD is offering payment options over 10 years at 3.25% with monthly payments of $60.00.  Other options are available including for low to moderate income households, households with people with disabilities and seniors (age 60 and above).  See full range of options here.

Project Document Links

Revised Abutter Presentation 8.23.16

Revised Abutter Payment Options 8.23.16 (Includes programs for Low Income, Elderly and Persons with Disabilities)

Abutter list

Abutter Project Area Maps

Program Steps

  • Engineering , Design & Permitting

    Summer 2017

  • Bidding & Contract Award

    Fall 2017

  • Construction

    Spring 2018